Showing posts with label Software Testing training toronto and placement assistance. Show all posts
Showing posts with label Software Testing training toronto and placement assistance. Show all posts

Sunday, 8 September 2013

Software Testing Training Toronto,Software Testing Training Mississauga,Software Testing Training Markham, Software Software Testing training Toronto and placement assistance,

Software Testing Training Toronto,Software Testing Training Mississauga,Software Testing Training Markham, Software Software Testing training Toronto  and placement assistance, software testing training Toronto.


STEPIN2IT.COM    CALL 416-743-6333   

25. What is the difference between latent and masked defects?
A latent defect is an existing defect that has not yet caused a failure because the sets of conditions were never met.

A masked defect is an existing defect that hasn't yet caused a failure just because another defect has prevented that part of the code from being executed.

Testing Training Toronto, Testing Training Mississauga, Testing Training Markham, Software Testing training Toronto  and placement assistance, software testing training Toronto, 

26. Can you explain calibration?
It includes tracing the accuracy of the devices used in the production, development and testing. Devices used must be maintained and calibrated to ensure that it is working in good order.
27. What's the difference between alpha and beta testing?
Software Testing Image

Alpha and beta testing has different meanings to different people. Alpha testing is the acceptance testing done at the development site. Some organizations have a different visualization of alpha testing. They consider alpha testing as testing which is conducted on early, unstable versions of software. On the contrary beta testing is acceptance testing conducted at the customer end.

In short, the difference between beta testing and alpha testing is the location where the tests are done.
28. How does testing affect risk?
A risk is a condition that can result in a loss. Risk can only be controlled in different scenarios but not eliminated completely. A defect normally converts to a risk.

Software Testing Image
29. What is coverage and what are the different types of coverage techniques?
Coverage is a measurement used in software testing to describe the degree to which the source code is tested. There are three basic types of coverage techniques as shown in the following figure:

Software Testing Image


  • Statement coverage: This coverage ensures that each line of source code has been executed and tested.
  • Decision coverage: This coverage ensures that every decision (true/false) in the source code has been executed and tested.
  • Path coverage: In this coverage we ensure that every possible route through a given part of code is executed and tested.
30. A defect which could have been removed during the initial stage is removed in a later stage. How does this affect cost?
If a defect is known at the initial stage then it should be removed during that stage/phase itself rather than at some later stage. It's a recorded fact that if a defect is delayed for later phases it proves more costly. The following figure shows how a defect is costly as the phases move forward. A defect if identified and removed during the requirement and design phase is the most cost effective, while a defect removed during maintenance is 20 times costlier than during the requirement and design phases.

Software Testing Image

For instance, if a defect is identified during requirement and design we only need to change the documentation, but if identified during the maintenance phase we not only need to fix the defect, but also change our test plans, do regression testing, and change all documentation. This is why a defect should be identified/removed in earlier phases and the testing department should be involved right from the requirement phase and not after the execution phase.

Source:http://www.indiabix.com/

Testing Training Scarborough, Testing Training Toronto,

13. What group of teams can do software testing?
When it comes to testing everyone in the world can be involved right from the developer to the project manager to the customer. But below are different types of team groups which can be present in a project.

  • Isolated test team
  • Outsource - we can hire external testing resources and do testing for our project.
  • Inside test team
  • Developers as testers
  • QA/QC team.
14. What impact ratings have you used in your projects?
Normally, the impact ratings for defects are classified into three types:

Software Testing Image


  • Minor: Very low impact but does not affect operations on a large scale.
  • Major: Affects operations on a very large scale.
  • Critical: Brings the system to a halt and stops the show.
15. Does an increase in testing always improve the project?
No an increase in testing does not always mean improvement of the product, company, or project. In real test scenarios only 20% of test plans are critical from a business angle. Running those critical test plans will assure that the testing is properly done. The following graph explains the impact of under testing and over testing. If you under test a system the number of defects will increase, but if you over test a system your cost of testing will increase. Even if your defects come down your cost of testing has gone up.
16. What's the relationship between environment reality and test phases?
Environment reality becomes more important as test phases start moving ahead. For instance, during unit testing you need the environment to be partly real, but at the acceptance phase you should have a 100% real environment, or we can say it should be the actual real environment. The following graph shows how with every phase the environment reality should also increase and finally during acceptance it should be 100% real.

Software Testing Image
17. What are different types of verifications?
Verification is static type of s/w testing. It means code is not executed. The product is evaluated by going through the code. Types of verification are:


  1. Walkthrough: Walkthroughs are informal, initiated by the author of the s/w product to a colleague for assistance in locating defects or suggestions for improvements. They are usually unplanned. Author explains the product; colleague comes out with observations and author notes down relevant points and takes corrective actions.
  2. Inspection: Inspection is a thorough word-by-word checking of a software product with the intention of Locating defects, Confirming traceability of relevant requirements etc.
18. How do test documents in a project span across the software development lifecycle?
The following figure shows pictorially how test documents span across the software development lifecycle. The following discusses the specific testing documents in the lifecycle:

Software Testing Image


  • Central/Project test plan: This is the main test plan which outlines the complete test strategy of the software project. This document should be prepared before the start of the project and is used until the end of the software development lifecycle.
  • Acceptance test plan: This test plan is normally prepared with the end customer. This document commences during the requirement phase and is completed at final delivery.
  • System test plan: This test plan starts during the design phase and proceeds until the end of the project.
  • Integration and unit test plan: Both of these test plans start during the execution phase and continue until the final delivery. 
 Testing Training Scarborough, Testing Training Toronto, Testing Training Markham, Struts Training, Software Testing training Toronto  and placement assistance,

source :http://www.indiabix.com

Sunday, 11 August 2013

Software Testing Training Mississauga , Markham, Scarborough

Software Testing Training Mississauga

The batch starting from 13 th july 2013 SAT
CALL 416-743-6333
Software Testing Course Information
The following is some general information about the course I am providing.
The nature of the course may change according to personal needs and prior knowledge/experience..
Course Duration 40 hour
a. If you are new to software testing and do not have experience with software development, the course is divided into 3 parts, each 30 hours long.
Please note that every student is different and holds a different amount of motivation, prior knowledge, and related experience. Therefore, for some students not all 3 parts of the course are needed for getting a job as a tester.
*On average, students usually get a job after 1-3 months of study and job search.
b. If you are currently a software developer, you would probably like a different approach.
It may take only 1-2 meetings, each 2-3 hours long where you would receive an accelerated method of training plus all the necessary materials needed for further independent study and job hunting. In many cases, students end up wanting more than 1-2 meetings because software testing is quite different than development and requires a different approach that takes a little bit of time to get used to.
Course Outline
Part 1: Introduction to the World of Software, including:
- computer Architecture (hardware & software)
- Operating Systems (multitasking, event-driven system, interfaces, Unix, Windows, Linux, Mainframe)
- Application Development Process SDLC (Waterfall, Rational Unified Process (RUP), Extreme Programming (XP))
- Fundamentals of Software Development (classes, objects, interfaces, functions, databases)
- The Essentials of Software Testing (methods, techniques, and tools)
Part 2: Software Testing, including:
- Client-Server Systems, Web Applications, and Various Business Applications.
- Manual Techniques & Methods
- Automated Tools (NUnit, WinRunner, QTPro, LoadRunner, QualityCenter, TestDirector, JMeter, Jira)
- Testing Types (sanity, functional, unit, regression, performance, security, and many others)
- Testing Documentation (test plans, test cases, test scripts, risk evaluation)
Part 3: Comprehensive Interview Preparation, including:
Resume (experience that fits employer expectations)
-Interview Questions & Answers
- Interview Strategy (active and aggressive presentation of your skills)
- References
* For those who need it, support is available after getting a job.
IF interested, please send an email expressing your interest in learning this sought after industry certification.
CALL US 416-743-6333
Register here :stepin2it.com
Software Testing(QA) mississauga
Skills: PRE-REQUISITES Before taking this course, participants should have at least 2-3 years of general business experience (any role) and/or sound understanding of computers

Saturday, 10 August 2013

Software Testing training toronto and placement assistance



Software Testing training  - ISTQB Approved
Software Testing training Toronto  and placement assistance ,
Rated Number 1 in n GTA by our student as placement records  for software testing training in Toronto, Brampton, Scarborough, Markham  .Get Trained by the best of Gurus of QA

Weekday, weekend, morning and evening batches available

New weekend batch is starting at on Saturday Aug 17, 2013 at 2.00 pm – 6:00 pm
New weekdays batch is starting at location on Monday Aug 19, 2013 at 6.30 pm – 8:30 pm

You can come and attend the FIRST CLASS as a FREE Demo Class



Contact Information: 416-743-6333
Email: info @ stepin2it.com Web: www.stepin2it.com

WHY STUDENTS CHOOSE OUR TRAINING?
ISTQB  Certified trainers with many years of IT experience
 Practical training sessions with live project
 Interactive training with 24X7 lab access
 Training certification assistance
 Classroom and On-line instructor led training
 Latest and constantly updated study materials
 

For further Information or to attend free demo class Please email us at info @ stepin2it.com or call us at 416-743-6333


Learn QA with projects from experienced and QA professionals from IT industry.
qa courses in Toronto,qa courses in Brampton,qa courses in Mississauga,qa courses in Markham.